A Smartwatch designed for young teens, Peace for parents, independence for kids. Stay connected anytime with video call & positioning. Use dual cameras to capture every moment.
imoo's first detachable Smartwatch!
Flip & detach design
front and rear dual
cameras
Flip & detach design
front and rear dual cameras
More angles for greater safety
Front & rear
dual cameras,
for video calls
Your child's live view and location — all on one screen!
The split-screen display shows real-time video on one side and location updates on the other, enabling you to know their status and whereabouts.
Note: imoo provides location and communication features to help parents stay informed about their child's activities.
More angles for greater safety
Front & rear
dual cameras,
for video calls
Switch cameras
remotely
Use the front camera to see your child and the rear camera to view their surroundings.
Note: imoo provides location and communication features to help parents stay informed about their child's activities.
More angles for greater safety
Front & rear
dual cameras,
for video calls
Handheld calling
Thanks to the flip & detach design, you can see a 360° view of your child's surroundings. Plus, they can detach and hold the watch to their ear for better sound in noisy environments.
Note: The functions depend on network conditions and battery performance. They are not intended for emergency use and are subject to parental authorization, as well as applicable privacy regulations.
Where is my child?
High-precision and Real-time Location Tracking
With 5 major satellite systems, and Google Map, X10 effectively locates your child precisely and becomes more accurate with continuous use.
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Picking up your child after school:
You're waiting at the school gate, but you don't know when they'll arrive.
Unlock your phone to see where your child is
Whether they're inside the classroom or outside on the playground, look, they're heading your way now!
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Weekend trips to the theme park:
It's hard not to worry when your child is out alone.
Unlock your phone
to see your child's status:
You can track your child's bus ride. Once they arrive, you'll know exactly where they are and how long they've been there.
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Curious about your child's day?Curious about your
child's day?
All-day high-precision tracking:
Retrace your child's daily movements and see where they've been over the past 14 days.
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Water-resistant up to 20m⑤⑥Water-resistant up
to 20m⑤⑥
Built for reliability. Made for peace of mind.
X10 also handles handwashing and splashes with ease.
Note: The X10 is water-resistant in accordance with ISO 22810:2010 standards. It withstands pressure equivalent to 20 meters of static water depth for up to 10 minutes.Notes:
The X10 is water-resistant in accordance with ISO 22810:2010 standards. It withstands pressure equivalent to 20 meters of static water depth for up to 10 minutes.
Hardcore quality
& rock-solid reliability
- certified by top authoritiesHardcore quality
& rock-solid
reliability
- certified by top
authorities
X10 has passed rigorous reliability tests and bio-environmental safety evaluations, meeting the U.S. and EU standards.
Reliable Quality
Damp Heat Test
Temperature Cycling Test
Drop Test
Compression Test
Highly Accelerated Life Test
Split Shaft Life Test
Micro Drop Test
High Temperature Life Test
Key Life Test
Biocompatibility Testing
Electromagnetic Radiation Testing
RSL-phthalate Testing
RSL-Nickel Release Testing
Notes:
Tests conducted by third-party laboratories and imoo Lab.
Equipped with
Qualcomm's chip for faster,
smoother performancefor faster,
smoother
performance
740mAh durable battery
Ultra-long
battery lifeUltra-long battery life
Equipped with a state-of-the-art silicon anode battery technology, imoo Smartwatch X10 has longer battery life under the same battery weight & volume category.
740mAh
Health monitoring
Child's health guardian
when you're afarHealth monitoring
Child's health
guardian when
you're afar
Heart Rate MonitoringHeart Rate
Monitoring
There heartbeat is always under your care.
Notes: This product is not a medical device. Heart rate data are for reference only. If the wearer feels unwell, please consult a doctor.
Fitness MonitoringFitness
Monitoring
More fun in sports, more active they are.The more fun they have in sports, the more active they are.
Note: Fitness data is provided for reference only and should not be used for medical purposes.
Get motivated through sportsGet motivated
through sports
Celebrate every achievement in your child's sports journey, fueling their passion for staying active.
10 sports modes10 sport modes
Let kids pick their favorite and break a sweat!
All-day statusstay connected toyour child'sday-to-day life.
Keep an eye on your child's Smartwatch anytime through your phone.
Compatible with Android and iOS, the imoo APP lets you easily connect to your child's Smartwatch and stay informed.
Parental control
Sleep Mode
Class Mode
App Control
Screen Time
Notes: Parents can manage these functions via the app to ensure safe and balanced use. Please see more details in our full Privacy Policy.
Simpler way to
convey messageSimpler way
to convey message
The imoo Smartwatch X10 makes text communication easier.The imoo Smartwatch X10 makes text communication
You can send texts, images, and videos to family and friends via Chat, along with fun emojis and voice messages.You can send texts, images, and videos to family and friends via Mini Chat, along with fun emojis and voice messages.
Bump and add friendsBump and add
friends
Kids connect face-to-face and build friendships safely.
A safe and kid-friendly social environment
This kid-friendly closed network blocks external social media distractions, providing a safe space to connect with family and friends and share joyful moments.
Block unknown calls for greater safety for your child.
Parents can stay fully informed about their kids' contacts on the Smartwatch and block calls from unknown numbers to protect them from strangers and other disturbances.
SOS emergency call
Quick and reliable: kids can draw a “C” on the screen to instantly alert parents in an emergency.
Note: These functions are available after being enabled in the imoo app. Please refer to actual usage conditions.
Dual camera
Capture wonderful moments more easilyDual camera
Capture wonderful
moments more
easily
Dual cameras for taking photos
With an 8MP rear camera and a 5MP front camera, every child is the little director of their own story!
Dual camera
Capture wonderful moments more easily
Your portable hands-free mini cameraYour portable hands-free
mini camera
Capture every moment, anytime, anywhere.
Note: The watch lanyard is an optional accessory and must be purchased separately.
Powered by the advanced PAMID chip for global band compatibility and a multi-mode tunable antenna, it delivers seamless, reliable connectivity.
Encryption for
privacy
data protection
Based on the EU's General Data Protection Regulation(GDPR), imoo has established comprehensive mechanisms to protect children's personal data throughout its entire lifecycle, ensuring secure communication among the Smartwatch, the cloud, and the parents' app.
Flagship Configuration
Redefining children's smartwatch standards
Flagship Chip
Qualcomm Snapdragon Wear 4100
High-Speed Network
4G
WiFi
2.4G/5GWiFi
Rated Battery
740mAh
Sound
Super linear loudspeaker
Storage
1GB+32GB
1+32GB
save more, enjoy more.
The little storyteller on your wristThe little storyteller
on your wrist
New integrated with the Audiobooks by ReadmioNew integrated with the
Audiobooks by Readmio
Note: Some features within the Readmio may require additional payment. These paid features are provided solely by the Readmio.
FAQs
Yes, very suitable. Thanks to its modern design and expanded functions, the X10 is ideal for children and teenagers aged 7 to 15 and is one of the highest-rated models in this age group.
The X10 features a foldable design. The display can be flipped upward and even completely detached from the wristband – ideal for creative photo and video taking.
No. imoo uses a closed system and does not offer an open app store to ensure safe use for children. Useful basic functions such as time and step counter are already pre-installed.
Using advanced sensors, the X10 can detect which floor a child is on in supported environments (e.g., shopping centers), further improving location accuracy.
The X10 has a heart rate sensor and currently supports heart rate measurement. Functions for measuring body temperature or mood analysis are not currently supported.
Photos taken with the watch can be sent to the parent app via the chat function and saved on the smartphone.
Technical SpecificationsTechnical
Specifications
Dimension
Without Band: 56.29×43.0×13.9mm
With Band: 240.45×43×13.9mm
British English / German / Spanish / Polish / Italian / French / American English / Chinese / Traditional Chinese / Thai
Notes:
1.
The product images displayed on the page are for illustration purposes only. Please refer to the actual product for more details.
2.
The actual battery life of the X10 may vary slightly depending on the usage environment.
3.
The X10 requires a SIM card and VoLTE service to use the calling function. Some features may be limited due to different services provided by carriers, and usage may also be affected by network conditions. If you have any questions, please contact customer service.
4.
Call blocking for unknown numbers. To use this feature, the caller ID service must be enabled on the SIM card.
5.
The watch is water resistant to 20 meters in accordance with ISO 22810:2010. It can be worn for shallow water activities such as swimming in a pool, but is not suitable for diving or other activities beyond the specified depth. For advice on using this type of water resistant product, please visit https://imoo.com/e-manual/
6.
All data mentioned on this page is based on our design specifications, laboratory testing, and supplier data. Actual performance may vary slightly due to differences in software versions, specific testing environments, and product versions.
7.
The 5MP front camera and 8MP rear camera refers to the camera's hardware resolution, not the final image or video quality. The resolution used during video calls may vary slightly depending on the actual conditions. If you have any questions, please contact customer service.
8.
Wireless carriers' network policies may change, actual usage prevails.
imoo smartwatch x10. video & call
A Smartwatch designed for young teens, Peace for parents, independence for kids. Stay connected anytime with video call & positioning. Use dual cameras to capture every moment.
imoo's first detachable Smartwatch!
Flip & detach design
front and rear dual
cameras
Flip & detach design
front and rear dual cameras
More angles for greater safety
Front & rear
dual cameras,
for video calls
Your child's live view and location — all on one screen!
The split-screen display shows real-time video on one side and location updates on the other, enabling you to know their status and whereabouts.
Note: imoo provides location and communication features to help parents stay informed about their child's activities.
More angles for greater safety
Front & rear
dual cameras,
for video calls
Switch cameras
remotely
Use the front camera to see your child and the rear camera to view their surroundings.
Note: imoo provides location and communication features to help parents stay informed about their child's activities.
More angles for greater safety
Front & rear
dual cameras,
for video calls
Handheld calling
Thanks to the flip & detach design, you can see a 360° view of your child's surroundings. Plus, they can detach and hold the watch to their ear for better sound in noisy environments.
Note: The functions depend on network conditions and battery performance. They are not intended for emergency use and are subject to parental authorization, as well as applicable privacy regulations.
Where is my child?
High-precision and Real-time Location Tracking
With 5 major satellite systems, and Google Map, X10 effectively locates your child precisely and becomes more accurate with continuous use.
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Picking up your child after school:
You're waiting at the school gate, but you don't know when they'll arrive.
Unlock your phone to see where your child is
Whether they're inside the classroom or outside on the playground, look, they're heading your way now!
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Weekend trips to the theme park:
It's hard not to worry when your child is out alone.
Unlock your phone
to see your child's status:
You can track your child's bus ride. Once they arrive, you'll know exactly where they are and how long they've been there.
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Curious about your child's day?Curious about your
child's day?
All-day high-precision tracking:
Retrace your child's daily movements and see where they've been over the past 14 days.
Note: The actual product only features a 2D map. The 3D visuals shown on this page are for illustrative purposes only.
Water-resistant up to 20m⑤⑥Water-resistant up
to 20m⑤⑥
Built for reliability. Made for peace of mind.
X10 also handles handwashing and splashes with ease.
Note: The X10 is water-resistant in accordance with ISO 22810:2010 standards. It withstands pressure equivalent to 20 meters of static water depth for up to 10 minutes.Notes:
The X10 is water-resistant in accordance with ISO 22810:2010 standards. It withstands pressure equivalent to 20 meters of static water depth for up to 10 minutes.
Hardcore quality
& rock-solid reliability
- certified by top authoritiesHardcore quality
& rock-solid
reliability
- certified by top
authorities
X10 has passed rigorous reliability tests and bio-environmental safety evaluations, meeting the U.S. and EU standards.
Reliable Quality
Damp Heat Test
Temperature Cycling Test
Drop Test
Compression Test
Highly Accelerated Life Test
Split Shaft Life Test
Micro Drop Test
High Temperature Life Test
Key Life Test
Biocompatibility Testing
Electromagnetic Radiation Testing
RSL-phthalate Testing
RSL-Nickel Release Testing
Notes:
Tests conducted by third-party laboratories and imoo Lab.
Equipped with
Qualcomm's chip for faster,
smoother performancefor faster,
smoother
performance
740mAh durable battery
Ultra-long
battery lifeUltra-long battery life
Equipped with a state-of-the-art silicon anode battery technology, imoo Smartwatch X10 has longer battery life under the same battery weight & volume category.
740mAh
Health monitoring
Child's health guardian
when you're afarHealth monitoring
Child's health
guardian when
you're afar
Heart Rate MonitoringHeart Rate
Monitoring
There heartbeat is always under your care.
Notes: This product is not a medical device. Heart rate data are for reference only. If the wearer feels unwell, please consult a doctor.
Fitness MonitoringFitness
Monitoring
More fun in sports, more active they are.The more fun they have in sports, the more active they are.
Note: Fitness data is provided for reference only and should not be used for medical purposes.
Get motivated through sportsGet motivated
through sports
Celebrate every achievement in your child's sports journey, fueling their passion for staying active.
10 sports modes10 sport modes
Let kids pick their favorite and break a sweat!
All-day statusstay connected toyour child'sday-to-day life.
Keep an eye on your child's Smartwatch anytime through your phone.
Compatible with Android and iOS, the imoo APP lets you easily connect to your child's Smartwatch and stay informed.
Parental control
Sleep Mode
Class Mode
App Control
Screen Time
Notes: Parents can manage these functions via the app to ensure safe and balanced use. Please see more details in our full Privacy Policy.
Simpler way to
convey messageSimpler way
to convey message
The imoo Smartwatch X10 makes text communication easier.The imoo Smartwatch X10 makes text communication
You can send texts, images, and videos to family and friends via Chat, along with fun emojis and voice messages.You can send texts, images, and videos to family and friends via Mini Chat, along with fun emojis and voice messages.
Bump and add friendsBump and add
friends
Kids connect face-to-face and build friendships safely.
A safe and kid-friendly social environment
This kid-friendly closed network blocks external social media distractions, providing a safe space to connect with family and friends and share joyful moments.
Block unknown calls for greater safety for your child.
Parents can stay fully informed about their kids' contacts on the Smartwatch and block calls from unknown numbers to protect them from strangers and other disturbances.
SOS emergency call
Quick and reliable: kids can draw a “C” on the screen to instantly alert parents in an emergency.
Note: These functions are available after being enabled in the imoo app. Please refer to actual usage conditions.
Dual camera
Capture wonderful moments more easilyDual camera
Capture wonderful
moments more
easily
Dual cameras for taking photos
With an 8MP rear camera and a 5MP front camera, every child is the little director of their own story!
Dual camera
Capture wonderful moments more easily
Your portable hands-free mini cameraYour portable hands-free
mini camera
Capture every moment, anytime, anywhere.
Note: The watch lanyard is an optional accessory and must be purchased separately.
Powered by the advanced PAMID chip for global band compatibility and a multi-mode tunable antenna, it delivers seamless, reliable connectivity.
Encryption for
privacy
data protection
Based on the EU's General Data Protection Regulation(GDPR), imoo has established comprehensive mechanisms to protect children's personal data throughout its entire lifecycle, ensuring secure communication among the Smartwatch, the cloud, and the parents' app.
Flagship Configuration
Redefining children's smartwatch standards
Flagship Chip
Qualcomm Snapdragon Wear 4100
High-Speed Network
4G
WiFi
2.4G/5GWiFi
Rated Battery
740mAh
Sound
Super linear loudspeaker
Storage
1GB+32GB
1+32GB
save more, enjoy more.
The little storyteller on your wristThe little storyteller
on your wrist
New integrated with the Audiobooks by ReadmioNew integrated with the
Audiobooks by Readmio
Note: Some features within the Readmio may require additional payment. These paid features are provided solely by the Readmio.
FAQs
Yes, very suitable. Thanks to its modern design and expanded functions, the X10 is ideal for children and teenagers aged 7 to 15 and is one of the highest-rated models in this age group.
The X10 features a foldable design. The display can be flipped upward and even completely detached from the wristband – ideal for creative photo and video taking.
No. imoo uses a closed system and does not offer an open app store to ensure safe use for children. Useful basic functions such as time and step counter are already pre-installed.
Using advanced sensors, the X10 can detect which floor a child is on in supported environments (e.g., shopping centers), further improving location accuracy.
The X10 has a heart rate sensor and currently supports heart rate measurement. Functions for measuring body temperature or mood analysis are not currently supported.
Photos taken with the watch can be sent to the parent app via the chat function and saved on the smartphone.
Technical SpecificationsTechnical
Specifications
Dimension
Without Band: 56.29×43.0×13.9mm
With Band: 240.45×43×13.9mm
British English / German / Spanish / Polish / Italian / French / American English / Chinese / Traditional Chinese / Thai
Notes:
1.
The product images displayed on the page are for illustration purposes only. Please refer to the actual product for more details.
2.
The actual battery life of the X10 may vary slightly depending on the usage environment.
3.
The X10 requires a SIM card and VoLTE service to use the calling function. Some features may be limited due to different services provided by carriers, and usage may also be affected by network conditions. If you have any questions, please contact customer service.
4.
Call blocking for unknown numbers. To use this feature, the caller ID service must be enabled on the SIM card.
5.
The watch is water resistant to 20 meters in accordance with ISO 22810:2010. It can be worn for shallow water activities such as swimming in a pool, but is not suitable for diving or other activities beyond the specified depth. For advice on using this type of water resistant product, please visit https://imoo.com/e-manual/
6.
All data mentioned on this page is based on our design specifications, laboratory testing, and supplier data. Actual performance may vary slightly due to differences in software versions, specific testing environments, and product versions.
7.
The 5MP front camera and 8MP rear camera refers to the camera's hardware resolution, not the final image or video quality. The resolution used during video calls may vary slightly depending on the actual conditions. If you have any questions, please contact customer service.
8.
Wireless carriers' network policies may change, actual usage prevails.